PPA SICILIA

In the second half of 2018, Manni Energy signed the first ten-year Power Purchasing Agreement (PPA) in Italy, believed to be the longest-term contract ever stipulated*.

PROJECT CATEGORY

Industrial

ASSOCIATE

Manni Energy

PLACE

Sicilia, italia

PROJECT

The PPA (Power Purchasing Agreement) envisages the sale of 100% of the energy generated by 5 plants built in Sicily in 2019. The project, born from a partnership between Manni Energy and Canadian Solar, in agreement with Trailstone, was delivered, fully operational, in March 2020. It is foreseen that the 17.6 MW of photovoltaic power will generate a total of over 35 GWh per year, equivalent to over 17,000 tonnes of CO2 avoided**.

*Source: Renewable Energy Report,

Polytechnic University of Milan, 2019

**Emission factor: 0.515 kgCO2

/kWh;

source: ISPRA, 2019